Wednesday 27th March 2019

Music: Eurythmics

Finishing off the panel modification today and the start of the landing lights.

There were a couple of areas where I needed to use filler and then sand with fine wet & dry.

Primer is applied and is ready for painting.

Ian was back today after a few days away and gave me a hand to get a wing up on the stands so I can install the landing lights, wire the trim motor and fit the strobes.

The LED units are installed in both wings.

The wires are shortened and connectors are crimped and inserted into the connector block.

The unit is secured into place with M4 screws and then checked to ensure they work!

The light cover is secured into position with tape…

and six holes for the M4 countersunk rivnuts are drilled…

and countersunk. The rivnuts are then installed…

and the light cover is fitted and secured into place with countersunk stainless steel screws.