Tuesday 4th June 2019

Music: Easy 80’s

Tom came down to stay for a couple of days and give me a hand. Luckily he bought some tools with him from the land of the giants!

Today we were concentrating on fitting the centre console, ensuring that all the control operate smoothly for the carb heat, cabin heater and demister. The park brake needed some special attention as it needed to operate with push on and pull off. This required the cable to exit the front of the console and loop back in. This would make it operate in the correct source but there would be about 100mm of unsupported cable which would bend and it’s unlikely to operate correctly. The other connection that would need a bit of thought would be the connection to the demister as it had a protrusion to connect to and not a hole like the other controls.

Tom always comes equipped for the job. I think he was was going to work on a JCB not a Bristell!
The demist, heater and carb heat control cables routing over the equipment tray.
A test of the parking brake proves that the cable will bend and fail to operate without additional support. Inside the centre console there are quite a few other cables and they need to be positioned so they don’t interfere with each other. In addition to this the fuel pipes have to fitted to the fuel selector.
Our solution is to prevent the outer cable from bending piece of aluminium tube and then making a bracket to support it in the console.
This looks to be a good solution to the problem. A final wire lock ensures that the cable doesn’t move, so full movement is realised.
A radio control clevis is used to connect to the cable. Time will tell whether this is a reliable solution.
The connector to the heater and…
…carb heat controls are very straightforward but the outer cables still need to be fully secured otherwise the whole cable will move and fail to operate the attached item.
The demist attachment required a different solution and after some thought we came up with the idea of using a piece of 2mm aluminium to extend the RC clevis.
The final solution which will do the job. The only thing to do is fit it!
So Tom launched into action! It’s all a bit difficult to get to.
But the solution worked well.
With two out of the three fuel pipes connected and all the wires and cables routed as require we can call it a day. Tomorrow sees the final fit and we can move on to the prep for fitting the panel and prop.
Lovely sky as we exited the workshop. Need to get the build finished so we can go fly in skies like these!