Music: Röyksopp
Good news – Today I’m expecting delivery of the Airmaster prop that was ordered in February. So I had brought back the switches and circuit breakers and thought that whilst waiting I would wire them up.







Music: Röyksopp
Good news – Today I’m expecting delivery of the Airmaster prop that was ordered in February. So I had brought back the switches and circuit breakers and thought that whilst waiting I would wire them up.







Music: Elton John and Turin Brakes
A few jobs today. Bond the switch plates to the panel, start populating the panel with switches, mark and drill the ignition switch hole, create the looms for the servos and solder to the respective servos.








Music: James Taylor and Oh Wonder
A couple of days away to do some flying and meet up with an old mate for a beer or two and now back to the grindstone!
A couple of items to complete the installation of the primary power system. The power and earthing arrangements that I’ve decided to use necessitates rearranging the items on the comms tray. Once this stage is complete and with virtually all the other activities complete until the prop arrives it’s time to move on to wiring the all the systems together. It’s getting to the stage where I need to finalise my panel design and start cutting it out. I haven’t decided whether I will do it myself of get a company to water cut it.








Music: Oh Wonder, Paolo Nutini
Today I focused on completing the primary power system and testing switch pitch layouts before fitting to the panel. Robin May and Dave Bennett came down for a visit and check my work out to make sure it was up to standard after which we went for a quick lunch in the Prince of Wales pub that is just across the road from the airfield. It was great to see them both.









Music: Elton John, Dido
With the delivery of a number of outstanding parts I was able to complete the wing locker and servo operating arm installs.















Music: Elton John
I had ordered several items whilst I was away in Prague which had been delivered by the time I got home so I was eager to get back to the build. These included a Shorai LiFePO4 battery and circuit breakers. I also received the servo connecting rods and wing locker fittings from Farry and replacement Aveo air vents that will allow me to finish off those two jobs.










Music: Celine Dion
Now a lot of the build stages have been signed off I can start to install the primary power system, avionics and associated wiring. When I got home I had received a parcel from Farry who had sent the outstanding items to finish the installation of the autopilot and wing lockers. A job that I can do next week now.







Music: Snow Patrol and Celine Dion
Finished off the installation of the tail strobe and pitot unit before starting work on the primary power system. Also 10 stages of the build were signed off by Ian.















Music: Elton John who we’re seeing in Prague next week!
Haven’t got a full day today but thought I could install some of the cables that I received yesterday in the post and the tail strobe.








Music: Snow Patrol
A few jobs whilst Andy is still here to help including the internal trim panels, OAT sensor, bleeding the brakes and pitot system installations.

The rear panel in normally riveted into the aircraft and has two access panels cut in with covers. I thought it would be a better idea if it was removable so decided to use 3mm screws and rivnuts to secure it instead. First job drill the 5mm hole for rivnuts.

The install the 37 rivnuts in the rear panel…

and 8 along this panel.

The finished job which looks quite good.

The supplied OAT cable is several metres long but I’ve decided to mount it close to the ADAHRS unit so I shortened it out by cutting some wire out of the the middle of the cable and soldered together which removes the need to crimp new ends on.

The OAT sensor is fitted from below and secured with a nylon nut and washer. I’ve used a bit of silicon to make it even more water tight from below before fitting.

The finished installation needs to be within 2 degrees of level in all planes so once the aircraft is finished I may have to shim the unit.

After bleeding the brakes I have two very small air bubbles left in the brake lines that need to be purged. The normal method didn’t work so thought using an electric pump might work. The whole thing turned into a disaster. The first attempt resulted in the electric pump sucking in air. The second attempt resulted in the pump forcing off the pipe. Then on the third attempt the pump failed after 5 seconds of continuous use. I gave up! will try again another time…

Moving onto the pitot installation. I’ve purchased an electrically headed pitot that needs power to it so I need to run power to the unit. There is conduit in the wing so will use this but it’s difficult to get to.

The only place I can easily mount the heater power unit is on access cover but the unit is just little bit big for the access hole so I had to cut the corners of the mounting bracket.

It’s secured onto the of the access panel with M4 screws, washers and nylocs.

It’s a perfect fit..

The view from the underside.

just needs to be connected and wires run up the conduit.

It’s a very tight fit but need to get my arm into the access panel to get to the conduit.